Concept study for a direct rail link between Aarau and Zurich |
2019
|
CH |
|
|
Condition assessment for critical infrastructure |
2021
|
CH |
|
|
Consequences of a power outage on critical infrastructures |
2010
|
CH |
|
|
Construction pit and tunnel link for Zurich Children’s Hospital |
2020
|
CH |
|
|
Construction Site D in Lenzburg |
2014
|
CH |
|
|
Consulting for Merging Wastewater Treatment Plants at the Jona River |
2021
|
CH |
|
|
Consulting for Merging Wastewater Treatment Plants at the Kempt River |
2020
|
CH |
|
|
Consulting of principal for extension of WWTP Hinwil |
2017
|
CH |
|
|
Cost assessment for littering in Switzerland |
2011
|
CH |
|
|
Cost-Benefit Analyses for Traffic-Management and Road-Maintenance Measures |
2018
|
CH |
|
|
Cost-benefit analysis for the Cheerstrasse expansion project |
2016
|
CH |
|
|
Creating a planning team for a road relocation project |
2023
|
CH |
|
|
Creating explainer videos relating to renewable natural gases for VSG |
2018
|
CH |
|
|
Creation of the access concept for the Irchel Campus |
2019
|
CH |
|
|
Crime prevention assessment at a town recreational site in Uster |
2022
|
CH |
|
|
Crime prevention assessment for the Central Railway Line in Luzern |
2013
|
CH |
|
|
Crime prevention assessment of SBB railway stations |
2017
|
CH |
|
|
Crime prevention assessment of the Cordula Passage in Baden |
2021
|
CH |
|
|