
Project
Feasibility of the "Fil Bleu Glatt" project to demarcate and develop the Glatt watercourse corridor
Year
Country
CH
Bellerivestrasse is one of the main arteries leading into Zurich from the south. It currently features two lanes in each direction and a calibrated traffic signal chain (green wave) with 15 traffic lights. We used a comprehensive traffic-simulation model to study the potential impact of the following modifications: lane reductions, adapted speed limits, bike lanes on both sides of the street and reversible-lane operation. The results serve as a basis for evaluation and decision making, as well as to facilitate public discourse.